Construction began on 12 January 2004, with the exterior of the structure completed on 1 October 2009. The building formally opened on 4 January 2010[9][10] and is a part of the two km2 (490-acre) Downtown Dubai improvement at the 'First Interchange' along Sheikh Zayed Road, near Dubai's important enterprise district.
The tower's structure and engineering were completed by using Skidmore, Owings & Merrill of Chicago, with Adrian Smith as chief architect, and Bill Baker as a primary structural engineer.[11][12] The firm had designed the Sears Tower in Chicago, a previous record holder for the arena's tallest constructing.
Hyder Consulting turned into supervising engineer and NORR Group Consultants supervised the architecture. The number one contractor become Samsung C&T of South Korea, collectively with the Belgian institution BESIX and the nearby agency Arabtec.[13]
Numerous lawsuits involved migrant employees from South Asia, the primary constructing labour force, who had been paid low wages and every so often had their passports confiscated.[14]
Architecture and layout
The tower became designed by using Skidmore, Owings, and Merrill (SOM), which additionally designed the Willis Tower (formerly the Sears Tower) in Chicago and the One World Trade Center in New York City. Burj Khalifa uses the bundled tube layout of the Willis Tower, invented via Fazlur Rahman Khan.[31][32] Due to its tubular gadget, proportionally most effective half of the amount of metal turned into used in the production, as compared to the Empire State Building.[31][33] Khan's contributions to the design of tall buildings have had a profound effect on architecture and engineering. It could be tough to locate any international practices in the design of tall buildings which have not been immediately or in a roundabout way stimulated with the aid of his work.[34] The design is paying homage to Frank Lloyd Wright's imaginative and prescient for The Illinois, a mile-high skyscraper designed for Chicago, in addition to Chicago's Lake Point Tower. When Adrian Smith changed into conceiving the project at SOM, he looked out his office window towards Lake Point Tower's curved 3-wing layout and thought, "There's the prototype".[35] According to Strabala, Burj Khalifa changed into designed primarily based on the 73rd ground Tower Palace Three, an all-residential constructing in Seoul. In its early making plans, Burj Khalifa become supposed to be entirely residential.[36]
After the unique design via Skidmore, Owings, and Merrill, Emaar Properties selected Hyder Consulting to be the supervising engineer and NORR Group Consultants International Ltd to oversee the structure of the challenge.[37] Hyder became decided on for their information in structural and MEP (mechanical, electric and plumbing) engineering.[38] Hyder Consulting's position become to supervise creation, certify the architect's design, and be the engineer and architect of document to the UAE authorities.[37] NORR's function become the supervision of all architectural additives inclusive of on-web page supervision at some point of the development and design of a 6-storey addition to the office annex constructing for architectural documentation. NORR was also liable for the architectural integration drawings for the Armani Hotel covered within the Tower. Emaar Properties additionally engaged GHD,[39] an global multidisciplinary consulting company, to behave as an independent verification and trying out authority for concrete and steelwork.
Construction
The tower changed into built via Samsung C&T from South Korea, which also did work on the Petronas Twin Towers and Taipei one zero one.[84] Samsung C&T constructed the tower in a joint mission with BESIX from Belgium and Arabtec from the UAE.[85][86] Turner was the undertaking supervisor on the principle creation settlement.[87] Hong Kong-based totally Far East Aluminium combined to offer the outdoors cladding for Burj Khalifa.[88][89]
The contractor and the engineer of document was Hyder Consulting.[90] Under UAE regulation, the contractor and the engineer of document is mutually and severally accountable for the performance of Burj Khalifa.
The number one structure is bolstered concrete. Putzmeister created a new, great excessive-stress trailer concrete pump, the BSA 14000 SHP-D, for this venture.[23] Burj Khalifa's creation used 330,000 m3 (431,600 cu yd) of concrete and fifty five,000 tonnes (61,000 brief heaps; fifty four,000 long tons) of steel rebar, and creation took 22 million guy-hours.[11] In May 2008 Putzmeister pumped concrete with greater than 21 MPA final compressive power of gravel to surpass the six hundred metres weight of the powerful place of every column from the muse to the next 4th stage, and the rest changed into through metal columns jacketed or included with concrete to a then global record shipping peak of 606 m (1,988 ft),[23] the 156th floor. Three tower cranes have been used at some stage in the construction of the uppermost ranges, every capable of lifting a 25-tonne load.[91] The closing shape above become constructed of lighter metallic.
In 2003, 33 take a look at holes were drilled to observe the energy of the bedrock underlying the shape.[92] "Weak to very weak sandstone and siltstone" turned into discovered, simply metres beneath the surface.[93] Samples have been taken from take a look at holes drilled to a intensity of a hundred and forty metres, locating weak to very vulnerable rock all of the manner.[94] The observe described the website online as a part of a "seismically lively location".[citation needed] Another challenging detail became the shamal which regularly creates sandstorms.[19]
Over forty five,000 m3 (58,900 cu yd) of concrete, weighing greater than 110,000 tonnes (one hundred twenty,000 quick heaps; one hundred ten,000 lengthy lots) had been used to construct the concrete and metallic basis, which features 192 piles; each pile is 1.5 metre in diameter with the aid of forty three m in period, buried greater than 50 m (164 ft) deep.[24] The basis became designed to aid the entire constructing weight of approximately 450,000 tonnes (500,000 brief heaps; 440,000 long heaps). This weight changed into then divided through the compressive power of concrete that is 30 MPa which yielded 450 sq. Metres of vertical everyday effective place, which then yielded 12 metres with the aid of 12 metres dimensions.[95] A cathodic safety machine is below the concrete to neutralise the sulphate and chloride-rich groundwater and prevent corrosion.[41][19]